

Buy anything from 5,000+ international stores. One checkout price. No surprise fees. Join 2M+ shoppers on Desertcart.
Desertcart purchases this item on your behalf and handles shipping, customs, and support to Vietnam.
โก Charge your creativity with capacitors that keep up!
This 10-piece kit of Cermant 450V 47ยตF aluminum radial electrolytic capacitors offers high voltage tolerance, stable capacitance with ยฑ20% tolerance, and heat resistance up to 105ยฐC. Ideal for tube amplifiers, vintage radio repairs, and precision DIY electronics projects, these polarized capacitors feature low leakage and low impedance for optimal performance.
















| ASIN | B0B8HTJ23T |
| Best Sellers Rank | #29,934 in Industrial & Scientific ( See Top 100 in Industrial & Scientific ) #130 in Industrial Electrical Capacitors |
| Brand Name | Cermant |
| Capacitance | 47 Microfarad |
| Capacitance Tolerance | 20 |
| Customer Reviews | 4.9 4.9 out of 5 stars (26) |
| Item Dimensions W x H | 0.63"W x 0.98"H |
| Item Shape | Round |
| Manufacturer | Cermant |
| Material Type | Aluminum |
| Maximum Voltage | 450 Volts |
| Mounting Type | Through-Hole Mount |
| Operating Voltage | 450 Volts |
| Upper Temperature Rating | 105 Degrees Celsius |
K**N
Good quality and high voltage rating.
These seem to be very good quality capacitors, and the 450V rating is great for my hobby renovating antique radios.
C**H
Within specified tolerance and working well
Working well as replacement capacitors in an 82-year old broadcast/shortwave radio.
T**D
good price and quality
I keep purchasing these electrolytics. They measure in tolerance and have great filtering characteristics.
A**T
These test great!
I needed high voltage filter capacitors for a project. The few that I sampled out of the 10 I received were all over 47uf, and had low leakage at a little over 400V (no need for me to go higher). Seems like a great set of capacitors!
G**0
Great Cap for the Price
Item exactly as described and worked perfectly. Highly recommend.
O**E
Poor quality Control
Rated as 47uf. All 10 are 40uf.
Trustpilot
1 month ago
2 weeks ago